BENEFIT

  • Reduced quantity of aggregate required for pavement construction
  • Lower costs and shorter construction time
  • Increased service life of the pavement
  • Reduced carbon footprint of the project
Client's Challenge

Offshore wind farm installation terminal in Świnoujście is the first of its kind in Poland. It will support storage of components used in the construction of wind farms; moreover, it will enable loading and deployment of towers using state-of-the-art jack-up vessels. The client had to design and construct haul roads and storage areas to guarantee seamless functioning of the terminal.

Tensar Solution

Design analysis encompassed a range of aspects, including determination of subgrade bearing capacity and predicted deformations. Various loads were taken into account, e.g. component storage and operation of cranes. Subgrade was variable and included interbeds of organic soils. Based on calculations, three pavement structures were proposed.

Product Used

Loading...

There are no results that match your search. Please try another search or Contact Us with further questions.